Induction and furnace lines
Hit forging temperature at the least kWh without overheating or decarburization, and carry the loop into heat-treat. Metric: energy per heat and thermal-defect scrap against the baseline.
Every forge already measures scrap, die changes, energy per heat, inspection escapes and new-part ramp time. Forgiron lands on one of those numbers, on one cell, with a baseline agreed in writing, and expands when it moves.
Illustrative scenario: Cell F-2 · 2,500 t closed-die press · 42CrMo4 connecting rod, one lot, one approval gate
The first paid pilot targets one of these. The metric column is what the pilot would be judged on.
Hit forging temperature at the least kWh without overheating or decarburization, and carry the loop into heat-treat. Metric: energy per heat and thermal-defect scrap against the baseline.
Predict fill and lap risk before the stroke and run the schedule that hits them at minimum blows and energy, under engineer approval. Metric: scrap, rework and energy per forging against the baseline.
Dose spray and cooling between strokes and schedule the die change before the first underfill. Metric: forgings per die and unplanned die changes against the baseline.
Fuse vision, thermal, ultrasonic, MPI and dimensional data, catch and predict defects, disposition with cited evidence. Metric: inspection escapes, scrap and downgrade against the baseline.
Move hot billets, forgings and dies by robot on takt, validated in simulation first. Metric: transfer time, temperature loss in transfer and manual handling removed.
Rehearse heating, stroke and die recipes on the twin, discard candidates that breach die load or lap risk, sequence the line. Metric: new-part introduction time and ramp scrap.
Forgiron is not a dashboard. Each agent closes a loop a forge already measures in scrap, die changes, kilowatt-hours and inspection escapes. The tables show what each loop watches and what it is allowed to move.
Thermal imaging, pyrometry and coil telemetry are fused at the edge into a live estimate of surface temperature, core-to-surface spread and soak. Heatrix adapts induction power and furnace zones to land the window without overheating or decarburization, and prices every heat in kilowatt-hours.
| Signal | Watches | Moves |
|---|---|---|
| Billet temperature | Pyrometer and thermal camera | Induction power, furnace zones |
| Core-to-surface spread | Estimated from heating curve | Soak time |
| Energy per heat | Coil and burner telemetry | Stage power inside the window |
Force curves, ram position and high-speed vision are fused with the incoming heat state. Forgeon predicts fill, grain flow and lap or underfill risk per piece and proposes the stroke schedule that hits them at minimum blows and energy, validated on the twin and approved by the forging engineer until the part family is qualified.
| Signal | Watches | Moves |
|---|---|---|
| Die fill | Force curve and high-speed vision | Blow energy, ram speed, under approval |
| Lap and underfill risk | Scored per piece | Energy trim inside the approved envelope |
| Grain flow | Modelled from stroke schedule | Schedule candidates ranked on the twin |
Die surface temperature, heat-check growth and lubricant coverage are modelled from thermal and vision between strokes. Diesmith doses spray and cooling to hold friction and fill and schedules the die change in a planned window instead of after the first underfill.
| Signal | Watches | Moves |
|---|---|---|
| Die temperature | Thermal camera between strokes | Spray dose and cooling |
| Heat-check growth | Vision per cavity | Die-change window |
| Lubricant coverage | Vision | Spray pattern and timing |
Vision, thermal, ultrasonic, MPI and dimensional data are fused into one model of soundness. Flawnex detects and predicts laps, folds, underfill, cracks and internal defects, routes suspect parts to the right check, and couples each finding back to the heat, stroke and die state behind it.
| Signal | Watches | Moves |
|---|---|---|
| Surface laps and cracks | Cameras and MPI | Energy trim via Forgeon, part routing |
| Internal defects | Ultrasonic station | Lot hold, root cause to heat and stroke |
| Dimension after cool-down | Dimensional scan | Spec envelope to the control agents |
Automotive and driveline, aerospace and defense, energy, industrial forgings, ring rolling and open-die. Most forges pick one cell and one wedge, prove the number, then expand.
Crankshafts, connecting rods, gears, axle and suspension parts at rate. Heatrix and Diesmith on the highest-volume cell first, where scrap and unplanned die changes are already counted.
Turbine and engine discs, landing gear and structural forgings under AS9100 and NADCAP. Flawnex on the inspection line, with genealogy and cited disposition from day one.
Turbine, oil and gas and nuclear forgings where a single internal defect is catastrophic. Flawnex and Forgetwin on the part family with the longest qualification cycle.
Closed-die and upsetting lines making industrial parts in many alloys. Forgeon and Diesmith on the press cell with the most changeovers.
Rings and open-die forgings where billet heating is the energy bill and the stroke count is high. Heatrix first, then Forgeon on the mill.
Every Forgiron run is an ordered, inspectable sequence. This is run_7c2e41 on Cell F-2 · 2,500 t closed-die press · 42CrMo4 connecting rod. Scenario completes in 10 steps with one approval gate. Surface temperature held at 1,205 °C with a 14 °C core-to-surface spread, fill predicted and confirmed complete, one lap precursor at the flash land cleared by a blow-energy trim, lot L-80412 released with full genealogy.
Plant Orchestrator · Pulled the part spec for the 42CrMo4 connecting rod from MES: forging window 1,180 to 1,230 °C, two-blow closed-die schedule, flash land 2.4 mm, temper to 28 to 32 HRC, 1,200 pieces. Locked the qualified process envelope.
Forge Twin · Simulated 24 candidate heat-and-stroke recipes on the as-forged twin for soak time, blow energy and spray timing, ranked on predicted fill, lap risk at the flash land, die load and kWh per piece.
Heat-and-Billet · Induction power on IH-2 stepped down 4% in the final soak stage as the pyrometer read 1,205 °C at the surface. Core-to-surface spread estimated at 14 °C against a 20 °C limit, no overheat, scale growth inside the window.
Die-and-Lube · Lower-die spray dose raised 6% and cooling extended 0.3 s as die surface temperature climbed through 240 °C. Heat-check growth on cavity 2 flagged at 0.31 of the die-change threshold.
Plant Orchestrator · Recipe #9 moves second-blow energy 3% below the standing schedule. Press-schedule changes stay supervised on this part family, so the step was held for the shift forging engineer and approved at 05:47:31.
Forge-and-Press · Two-blow schedule executed with the approved energy. High-speed vision and force curves confirmed complete fill on the first ten pieces; predicted lap risk at the flash land fell from 0.27 to 0.08.
Defect-and-Inspect · Eight cameras, two thermal cameras and the ultrasonic station fused at the edge. One lap precursor at the flash land on piece 212 flagged and cleared by a 1.5% blow-energy trim inside the approved envelope; the piece was routed to MPI and passed.
Robot-and-Handling · Press-to-trim transfer planned and executed by the handling robot at 11 s per piece, temperature loss in transfer 38 °C against a 60 °C limit, interlock zones clear throughout.
Trim-and-Heat · Temper furnace HT-1 zone 2 trimmed 5 °C against the predicted hardness from the recorded heat and stroke history. First hardness checks read 30 HRC, inside 28 to 32.
Quality-and-Conformance · Lot L-80412 released: genealogy written (billet lot, heat curve, stroke record, die cycles, inspection map, approvals, temper record) and dispositioned against IATF 16949 criteria with cited evidence for the quality engineer's sign-off.
We have no customer quotes to show yet and will not invent any. These are the three roles in a forge we build for, and the problems they bring to the first meeting.
What this person is dealing with today
What this person is dealing with today
What this person is dealing with today
A forge does not go from manual to unattended in one step. Forgiron makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk actions. Press control stays supervised until the part family is qualified.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads thermal, vision, ultrasonic, MPI, press, die, robot and MES signals; predicts and recommends; writes nothing | Runs the cell as today; compares predictions to inspection and engineer outcomes | Shadow mode, baseline 30 to 60 days |
| L2 · Assist | Proposes heating, press, die-lube, routing and handling actions with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode, the remainder of a 90 to 180 day pilot |
| L3 · Bounded | Executes pre-approved low-risk actions: inspection routing, lube timing, heating and soak adjustments, robot path variants, inside PLC and safety limits | Approves press-schedule changes, die changes and lot release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Scaled | Supervised press-schedule adaptation for qualified part families, across cells and sites | Sets the envelope; reviews the shift record and the evaluation results | Planned; after golden-dataset evaluation, simulation validation and quality sign-off |
Land on one workflow with a measured baseline. Expand by cell, module and autonomy level. Outcome components are available on yield, scrap, die life and energy. Annual prepay carries a 15 to 20% discount.
Heating or forging control, die management, or inspection AI for one cell. For forges validating ROI on the wedge.
The whole forge: heat and billet, forge and press, die and lube, trim and heat-treat, defect, quality and property, yield and takt, robotic handling and the twin.
Multi-site forging groups standardising on Forgiron, with custom alloy, die and qualification models.
The questions plant directors, forging engineers and quality engineers ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified process envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Forgiron writes nothing. Press-schedule changes stay supervised by a named forging engineer until the part family is qualified.
Control returns to the furnace, press or die controller's last known-good state. Forgiron is a supervisory layer on top of the PLCs and interlocks you already run, never a replacement for them, so an outage degrades the cell to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin and the part spec in the first weeks. Defect, die-wear and heating prediction improve as cell history and labelled outcomes accumulate per part family. The first training sets are sized at 2 million labelled frames and signals, 20,000 heat and press cycles and 10,000 die-life events per design-partner cohort, all design targets.
Only if you choose cloud training. Die designs, part drawings, recipes, process models and quality records are isolated per tenant and never used to train another customer's models. A fully on-prem deployment at the plant edge is available for sensitive producers, and federated learning across sites is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot of 90 to 180 days on one cell, scoped to a single wedge with a success metric written into the order form: defect-detection accuracy, scrap reduction, die-change reduction, energy reduction or first-pass-quality improvement. The first 30 to 60 days baseline scrap, die life, energy, inspection escapes and takt in shadow mode.
Start with one heating, press, die or inspection cell and one measurable baseline. A paid pilot on billet heating and press fill, die life or ultrasonic and MPI defect detection shows the number before you commit further.