01
ingest.order
✓ SUCCEEDED
0.6 s
Plant Orchestrator · Pulled the part spec for the 42CrMo4 connecting rod from MES: forging window 1,180 to 1,230 °C, two-blow closed-die schedule, flash land 2.4 mm, temper to 28 to 32 HRC, 1,200 pieces. Locked the qualified process envelope.
-
02
twin.simulate
✓ SUCCEEDED
52 s
Forge Twin · Simulated 24 candidate heat-and-stroke recipes on the as-forged twin for soak time, blow energy and spray timing, ranked on predicted fill, lap risk at the flash land, die load and kWh per piece.
-
03
heat.soak
✓ SUCCEEDED
2 m 10 s
Heat-and-Billet · Induction power on IH-2 stepped down 4% in the final soak stage as the pyrometer read 1,205 °C at the surface. Core-to-surface spread estimated at 14 °C against a 20 °C limit, no overheat, scale growth inside the window.
-
04
die.spray
✓ SUCCEEDED
48 s
Die-and-Lube · Lower-die spray dose raised 6% and cooling extended 0.3 s as die surface temperature climbed through 240 °C. Heat-check growth on cavity 2 flagged at 0.31 of the die-change threshold.
-
05
approve.human
◆ APPROVAL
46 s
Plant Orchestrator · Recipe #9 moves second-blow energy 3% below the standing schedule. Press-schedule changes stay supervised on this part family, so the step was held for the shift forging engineer and approved at 05:47:31.
-
06
forge.stroke
✓ SUCCEEDED
1 m 36 s
Forge-and-Press · Two-blow schedule executed with the approved energy. High-speed vision and force curves confirmed complete fill on the first ten pieces; predicted lap risk at the flash land fell from 0.27 to 0.08.
-
07
inspect.fuse
✓ SUCCEEDED
continuous
Defect-and-Inspect · Eight cameras, two thermal cameras and the ultrasonic station fused at the edge. One lap precursor at the flash land on piece 212 flagged and cleared by a 1.5% blow-energy trim inside the approved envelope; the piece was routed to MPI and passed.
-
08
handle.transfer
✓ SUCCEEDED
continuous
Robot-and-Handling · Press-to-trim transfer planned and executed by the handling robot at 11 s per piece, temperature loss in transfer 38 °C against a 60 °C limit, interlock zones clear throughout.
-
09
heat.treat
✓ SUCCEEDED
continuous
Trim-and-Heat · Temper furnace HT-1 zone 2 trimmed 5 °C against the predicted hardness from the recorded heat and stroke history. First hardness checks read 30 HRC, inside 28 to 32.
-
10
lot.release
✓ SUCCEEDED
1 m 20 s
Quality-and-Conformance · Lot L-80412 released: genealogy written (billet lot, heat curve, stroke record, die cycles, inspection map, approvals, temper record) and dispositioned against IATF 16949 criteria with cited evidence for the quality engineer's sign-off.