Typed, ordered, inspectable
A run is a goal, a plan and a graph of typed steps. Every step has an agent, a tool, a duration and a status, and the whole record is kept per part and lot.
Forgiron's features are the mechanics of a system that is allowed to touch production equipment: typed runs, a policy engine, named approvals, fused inspection, a twin, genealogy and an audit log. The list below is design scope, not a shipped feature list.
Illustrative scenario: Cell F-2 · 2,500 t closed-die press · 42CrMo4 connecting rod, one lot, one approval gate
Each capability names what it does and where its limit sits.
A run is a goal, a plan and a graph of typed steps. Every step has an agent, a tool, a duration and a status, and the whole record is kept per part and lot.
Tag allow-lists, per-tag rate and magnitude limits, the qualified process envelope, autonomy level, shift, part family and interlock state are evaluated before any setpoint moves.
Press-schedule changes, die changes and lot release wait for the approver the forge names. The request, the evidence and the decision are logged.
Vision, thermal, ultrasonic, MPI and dimensional data fused into one estimate of soundness, localised to part, lot, die cavity and stroke.
Candidate heating, stroke and die recipes ranked on fill, lap risk, die load and energy before a setpoint moves. Proven setpoints handed to the control agents.
Billet lot, heat curve, stroke record, die cycles, inspection map, approvals, heat-treat record and disposition, exportable for customer, first-article and qualification review.
Forging and die engineers see recommendations with their evidence, approve or correct them, and those corrections train the models.
Every agent action with source evidence, the approved process envelope, confidence, predicted yield, scrap, die-life and energy impact, rollback path, approver and lot scope.
Retrieval over recipes, die and forging specs, AS9100, IATF 16949, NADCAP and ASTM documents and quality procedures, tenant-isolated.
Per-forge yield and quality history and per-operator and die-engineer performance memory, versioned and scoped per tenant.
Rare lap, fold, underfill, crack and die-wear variants generated to augment training and always validated against real inspection distributions before promotion. Planned.
Model versions promoted by cell with canary rollout and automatic fallback; group policy with per-site override on the Enterprise tier.
Every Forgiron run is an ordered, inspectable sequence. This is run_7c2e41 on Cell F-2 · 2,500 t closed-die press · 42CrMo4 connecting rod. Scenario completes in 10 steps with one approval gate. Surface temperature held at 1,205 °C with a 14 °C core-to-surface spread, fill predicted and confirmed complete, one lap precursor at the flash land cleared by a blow-energy trim, lot L-80412 released with full genealogy.
Plant Orchestrator · Pulled the part spec for the 42CrMo4 connecting rod from MES: forging window 1,180 to 1,230 °C, two-blow closed-die schedule, flash land 2.4 mm, temper to 28 to 32 HRC, 1,200 pieces. Locked the qualified process envelope.
Forge Twin · Simulated 24 candidate heat-and-stroke recipes on the as-forged twin for soak time, blow energy and spray timing, ranked on predicted fill, lap risk at the flash land, die load and kWh per piece.
Heat-and-Billet · Induction power on IH-2 stepped down 4% in the final soak stage as the pyrometer read 1,205 °C at the surface. Core-to-surface spread estimated at 14 °C against a 20 °C limit, no overheat, scale growth inside the window.
Die-and-Lube · Lower-die spray dose raised 6% and cooling extended 0.3 s as die surface temperature climbed through 240 °C. Heat-check growth on cavity 2 flagged at 0.31 of the die-change threshold.
Plant Orchestrator · Recipe #9 moves second-blow energy 3% below the standing schedule. Press-schedule changes stay supervised on this part family, so the step was held for the shift forging engineer and approved at 05:47:31.
Forge-and-Press · Two-blow schedule executed with the approved energy. High-speed vision and force curves confirmed complete fill on the first ten pieces; predicted lap risk at the flash land fell from 0.27 to 0.08.
Defect-and-Inspect · Eight cameras, two thermal cameras and the ultrasonic station fused at the edge. One lap precursor at the flash land on piece 212 flagged and cleared by a 1.5% blow-energy trim inside the approved envelope; the piece was routed to MPI and passed.
Robot-and-Handling · Press-to-trim transfer planned and executed by the handling robot at 11 s per piece, temperature loss in transfer 38 °C against a 60 °C limit, interlock zones clear throughout.
Trim-and-Heat · Temper furnace HT-1 zone 2 trimmed 5 °C against the predicted hardness from the recorded heat and stroke history. First hardness checks read 30 HRC, inside 28 to 32.
Quality-and-Conformance · Lot L-80412 released: genealogy written (billet lot, heat curve, stroke record, die cycles, inspection map, approvals, temper record) and dispositioned against IATF 16949 criteria with cited evidence for the quality engineer's sign-off.
Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the forge.
Plan, thought, action, observation, exactly as the orchestrator would record it.
Run the 42CrMo4 connecting-rod lot on cell F-2 inside the qualified window, hold full fill with zero laps at the flash land, and land hardness between 28 and 32 HRC.
Simulate heat-and-stroke recipes on the twin first. Lead with heating so the billet state is right before the stroke, then set spray against die temperature, then execute the approved press schedule. Fuse inspection continuously. Hold any press-schedule change for a human.
The standing schedule runs the second blow hot enough to guarantee fill on a cold billet. With the induction soak held at 1,205 °C the twin predicts the same fill at 3% less energy and lower flash-land lap risk, because the metal arrives more uniform.
twin.simulate(candidates=24) returns recipe #9: stage-3 induction power down 4%, lower-die spray up 6%, second-blow energy down 3%.
Recipe #9 predicts fill 1.00, lap risk 0.08 and 1.9 kWh per piece. Two candidates scored lower on energy but pushed predicted die load past the cavity-2 limit and were discarded.
Execute recipe #9: seven bounded writes permitted on heating, spray, handling and heat-treat; the press-schedule write routed to the shift forging engineer.
Lap precursor at the flash land on piece 212 at 06:21:40. A 1.5% blow-energy trim inside the approved envelope cleared it in 17 s; the piece was routed to MPI and passed.
Scenario complete. Fill confirmed, no laps escaped, hardness 30 HRC. Lot L-80412 released with full genealogy.
Forgiron is not a dashboard. Each agent closes a loop a forge already measures in scrap, die changes, kilowatt-hours and inspection escapes. The tables show what each loop watches and what it is allowed to move.
Thermal imaging, pyrometry and coil telemetry are fused at the edge into a live estimate of surface temperature, core-to-surface spread and soak. Heatrix adapts induction power and furnace zones to land the window without overheating or decarburization, and prices every heat in kilowatt-hours.
| Signal | Watches | Moves |
|---|---|---|
| Billet temperature | Pyrometer and thermal camera | Induction power, furnace zones |
| Core-to-surface spread | Estimated from heating curve | Soak time |
| Energy per heat | Coil and burner telemetry | Stage power inside the window |
Force curves, ram position and high-speed vision are fused with the incoming heat state. Forgeon predicts fill, grain flow and lap or underfill risk per piece and proposes the stroke schedule that hits them at minimum blows and energy, validated on the twin and approved by the forging engineer until the part family is qualified.
| Signal | Watches | Moves |
|---|---|---|
| Die fill | Force curve and high-speed vision | Blow energy, ram speed, under approval |
| Lap and underfill risk | Scored per piece | Energy trim inside the approved envelope |
| Grain flow | Modelled from stroke schedule | Schedule candidates ranked on the twin |
Die surface temperature, heat-check growth and lubricant coverage are modelled from thermal and vision between strokes. Diesmith doses spray and cooling to hold friction and fill and schedules the die change in a planned window instead of after the first underfill.
| Signal | Watches | Moves |
|---|---|---|
| Die temperature | Thermal camera between strokes | Spray dose and cooling |
| Heat-check growth | Vision per cavity | Die-change window |
| Lubricant coverage | Vision | Spray pattern and timing |
Vision, thermal, ultrasonic, MPI and dimensional data are fused into one model of soundness. Flawnex detects and predicts laps, folds, underfill, cracks and internal defects, routes suspect parts to the right check, and couples each finding back to the heat, stroke and die state behind it.
| Signal | Watches | Moves |
|---|---|---|
| Surface laps and cracks | Cameras and MPI | Energy trim via Forgeon, part routing |
| Internal defects | Ultrasonic station | Lot hold, root cause to heat and stroke |
| Dimension after cool-down | Dimensional scan | Spec envelope to the control agents |
A forge does not go from manual to unattended in one step. Forgiron makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk actions. Press control stays supervised until the part family is qualified.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads thermal, vision, ultrasonic, MPI, press, die, robot and MES signals; predicts and recommends; writes nothing | Runs the cell as today; compares predictions to inspection and engineer outcomes | Shadow mode, baseline 30 to 60 days |
| L2 · Assist | Proposes heating, press, die-lube, routing and handling actions with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode, the remainder of a 90 to 180 day pilot |
| L3 · Bounded | Executes pre-approved low-risk actions: inspection routing, lube timing, heating and soak adjustments, robot path variants, inside PLC and safety limits | Approves press-schedule changes, die changes and lot release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Scaled | Supervised press-schedule adaptation for qualified part families, across cells and sites | Sets the envelope; reviews the shift record and the evaluation results | Planned; after golden-dataset evaluation, simulation validation and quality sign-off |
A stroke lasts a fraction of a second and a billet cools while it waits. Perception has to be local, deterministic and fast, so Forgiron runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.
8 to 24 cameras per line plus thermal, ultrasonic, MPI, press and ram streams fused at the cell. Sub-100 ms visual alerts and sub-500 ms recommendations are the design targets. Jetson Thor is planned for higher sensor density.
Defect, ultrasonic and MPI fusion, die-wear, heating, press-fill, property and disposition models behind one orchestrator at the plant edge, routed by latency, tenant, sensitivity and cost, with canary rollout by cell.
Multimodal defect, die-wear, heating, press-fill, property and quality-disposition models trained on thermal images, high-speed vision, ultrasonic and MPI signals, press curves and engineer corrections. Dedicated training capacity is planned.
Billet heating, die thermal state, press stroke, fill, stress, die load and robot handling simulated before the stroke. GPU forging FEM is the workload; physics-informed surrogates are planned so recipes rank at production cadence.
Rare lap, fold, underfill, crack and die-wear scenarios generated and validated against real inspection distributions before promotion. Planned.
Die allocation, press sequencing, heating batches, heat-treat queues, robot and takt coordination and inspection routing.
Hot billet, forging, die and trim handling skills trained and validated in simulation before they run next to a press.
Daily features from thermal, video, ultrasonic, MPI, press and genealogy data for retraining, drift detection and yield, scrap, die-life and energy benchmarks.
Forgiron writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, and every action is written to an append-only audit log the forge owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| AS9100 and NADCAP assurance packages | Disposition and genealogy evidence | QUEUED Planned, 6 to 12 months; not a certification claim |
| Standards-cited reasoning | AS9100, IATF 16949, NADCAP, ASTM documents | RUNNING In the design, every answer cites its source |
| Per-tenant and die-IP isolation | Recipes, die designs, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Sensitive producers | RUNNING Design option |
The questions plant directors, forging engineers and quality engineers ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified process envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Forgiron writes nothing. Press-schedule changes stay supervised by a named forging engineer until the part family is qualified.
Control returns to the furnace, press or die controller's last known-good state. Forgiron is a supervisory layer on top of the PLCs and interlocks you already run, never a replacement for them, so an outage degrades the cell to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin and the part spec in the first weeks. Defect, die-wear and heating prediction improve as cell history and labelled outcomes accumulate per part family. The first training sets are sized at 2 million labelled frames and signals, 20,000 heat and press cycles and 10,000 die-life events per design-partner cohort, all design targets.
Only if you choose cloud training. Die designs, part drawings, recipes, process models and quality records are isolated per tenant and never used to train another customer's models. A fully on-prem deployment at the plant edge is available for sensitive producers, and federated learning across sites is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot of 90 to 180 days on one cell, scoped to a single wedge with a success metric written into the order form: defect-detection accuracy, scrap reduction, die-change reduction, energy reduction or first-pass-quality improvement. The first 30 to 60 days baseline scrap, die life, energy, inspection escapes and takt in shadow mode.
Start with one heating, press, die or inspection cell and one measurable baseline. A paid pilot on billet heating and press fill, die life or ultrasonic and MPI defect detection shows the number before you commit further.