Pricing

Priced per cell. Justified per forging.

Cell, Plant and Enterprise. The Cell tier covers one control, die or inspection module on one forging or heat-treat cell or line. Plant covers the whole forge. Enterprise is for multi-site groups. Annual prepay carries a 15 to 20% discount and outcome components are available on yield, scrap, die life and energy.

Cell · $15,000 per cell / monthPlant · $90,000 / monthEnterprise · $650k to $8.5M ACV

Packaging logic

Land, expand, monetise the value

  1. Land. Low-friction entry on one workflow with a clear ROI metric, on the Cell tier.
  2. Expand. Cells, lines, modules, sites and autonomy level, into Plant and Enterprise.
  3. Monetise value. Usage and outcome pricing on yield, scrap, die life and energy capture upside as the agent does more of the work.

Floor pricing is protected. Discounts are traded for term length and a published case study.

Pricing

Priced per cell, per plant, per group

Land on one workflow with a measured baseline. Expand by cell, module and autonomy level. Outcome components are available on yield, scrap, die life and energy. Annual prepay carries a 15 to 20% discount.

Billing period
Cell $15,000 per forging or heat-treat cell or line / month · billed monthly

Heating or forging control, die management, or inspection AI for one cell. For forges validating ROI on the wedge.

  • One cell, one agent module
  • Plant-edge inference node included
  • Controller and sensor reads, guarded writes
  • Run log, audit trail, forging genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $650k to $8.5M ACV

Multi-site forging groups standardising on Forgiron, with custom alloy, die and qualification models.

  • Multi-site fleet management
  • Custom alloy, die and qualification models
  • Plant edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Compare

What is in each tier

Products are licensed per cell on the Cell tier and bundled on Plant and Enterprise.

What is in each tier
CapabilityCellPlantEnterprise
Cells covered1All on siteAll in group
Agent modules1 of 6 productsAll agentsAll agents + custom models
As-forged twin (Forgetwin)NoIncludedCustom part-family twins
Plant-edge nodeIncludedPer cellFleet managed
Guarded controller writesScoped tagsAll scoped tagsGroup policy
Forging genealogyIncludedIncludedIncluded + qualification packets
Autonomy levelsL1 to L2L1 to L3L1 to L4 when qualified
SSO and RBACNoPlannedPlanned, with approval chains
On-prem deploymentNoOptionalIncluded
SupportBusiness hours24/724/7 + named engineer
Indicative price$15,000/mo$90,000/mo$650k to $8.5M ACV
ROI

The arithmetic a forge runs

We do not publish savings percentages because we have not measured any yet. These are the inputs a forge brings to the pilot baseline, and the outputs the pilot measures.

Inputs you already have

  • Scrap and downgrade per lot, with the defect type behind each
  • Unplanned die changes per month and minutes lost per change
  • Energy per heat on induction, furnace and heat-treat lines
  • Inspection escapes, quarantines and requalification events
  • Takt and manual handling hours per cell
  • New-part introduction time and ramp scrap per part family

What the pilot measures

  • Defect, grain-flow and die-wear accuracy against the engineer and inspection baseline on the wedge workflow
  • Yield and first-pass-quality improvement
  • Scrap, die-change and energy reduction
  • Safety-escape reduction and consistency improvement
  • A hard ROI metric tied to the Cell price
  • Conversion of the design partner to paid
Run timeline · scenario

What you are actually buying

A run engine that produces this record on every lot, every shift, on every cell you license.

run_7c2e41 Cell F-2 · 2,500 t closed-die press · 42CrMo4 connecting rod illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.6 s

    Plant Orchestrator · Pulled the part spec for the 42CrMo4 connecting rod from MES: forging window 1,180 to 1,230 °C, two-blow closed-die schedule, flash land 2.4 mm, temper to 28 to 32 HRC, 1,200 pieces. Locked the qualified process envelope.

  2. 02 twin.simulate SUCCEEDED 52 s

    Forge Twin · Simulated 24 candidate heat-and-stroke recipes on the as-forged twin for soak time, blow energy and spray timing, ranked on predicted fill, lap risk at the flash land, die load and kWh per piece.

  3. 03 heat.soak SUCCEEDED 2 m 10 s

    Heat-and-Billet · Induction power on IH-2 stepped down 4% in the final soak stage as the pyrometer read 1,205 °C at the surface. Core-to-surface spread estimated at 14 °C against a 20 °C limit, no overheat, scale growth inside the window.

  4. 04 die.spray SUCCEEDED 48 s

    Die-and-Lube · Lower-die spray dose raised 6% and cooling extended 0.3 s as die surface temperature climbed through 240 °C. Heat-check growth on cavity 2 flagged at 0.31 of the die-change threshold.

  5. 05 approve.human APPROVAL 46 s

    Plant Orchestrator · Recipe #9 moves second-blow energy 3% below the standing schedule. Press-schedule changes stay supervised on this part family, so the step was held for the shift forging engineer and approved at 05:47:31.

  6. 06 forge.stroke SUCCEEDED 1 m 36 s

    Forge-and-Press · Two-blow schedule executed with the approved energy. High-speed vision and force curves confirmed complete fill on the first ten pieces; predicted lap risk at the flash land fell from 0.27 to 0.08.

  7. 07 inspect.fuse SUCCEEDED continuous

    Defect-and-Inspect · Eight cameras, two thermal cameras and the ultrasonic station fused at the edge. One lap precursor at the flash land on piece 212 flagged and cleared by a 1.5% blow-energy trim inside the approved envelope; the piece was routed to MPI and passed.

  8. 08 handle.transfer SUCCEEDED continuous

    Robot-and-Handling · Press-to-trim transfer planned and executed by the handling robot at 11 s per piece, temperature loss in transfer 38 °C against a 60 °C limit, interlock zones clear throughout.

  9. 09 heat.treat SUCCEEDED continuous

    Trim-and-Heat · Temper furnace HT-1 zone 2 trimmed 5 °C against the predicted hardness from the recorded heat and stroke history. First hardness checks read 30 HRC, inside 28 to 32.

  10. 10 lot.release SUCCEEDED 1 m 20 s

    Quality-and-Conformance · Lot L-80412 released: genealogy written (billet lot, heat curve, stroke record, die cycles, inspection map, approvals, temper record) and dispositioned against IATF 16949 criteria with cited evidence for the quality engineer's sign-off.

Segments

Which plan fits

Automotive and driveline, aerospace and defense, energy, industrial forgings, ring rolling and open-die. Most forges pick one cell and one wedge, prove the number, then expand.

Automotive and drivelineVolume, scrap and die cost

Automotive and driveline

Crankshafts, connecting rods, gears, axle and suspension parts at rate. Heatrix and Diesmith on the highest-volume cell first, where scrap and unplanned die changes are already counted.

Aerospace and defenseQualification burden

Aerospace and defense

Turbine and engine discs, landing gear and structural forgings under AS9100 and NADCAP. Flawnex on the inspection line, with genealogy and cited disposition from day one.

EnergyHigh part value

Energy

Turbine, oil and gas and nuclear forgings where a single internal defect is catastrophic. Flawnex and Forgetwin on the part family with the longest qualification cycle.

Industrial forgingsValves, flanges, fittings

Industrial forgings

Closed-die and upsetting lines making industrial parts in many alloys. Forgeon and Diesmith on the press cell with the most changeovers.

Ring rolling and open-dieLarge sections, long heats

Ring rolling and open-die

Rings and open-die forgings where billet heating is the energy bill and the stroke count is high. Heatrix first, then Forgeon on the mill.

Guardrails

An agent that can move a press schedule needs a leash

Forgiron writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, and every action is written to an append-only audit log the forge owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits and the qualified process envelope for the part family.
  • Policy engine before every write. Autonomy level, shift, part family, interlock state and operator presence are evaluated before a setpoint moves.
  • Human-in-the-loop gates. Press-schedule changes, die changes and lot release wait for a named approver. Safety-critical press control stays guarded by PLC interlocks and engineer approval until qualification evidence supports more.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the approved process envelope, confidence, estimated yield, scrap, die-life and energy impact, rollback path, approver and lot scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the furnace, press or die controller's last known-good state. Interlocks are never in Forgiron's path.
  • Tenant and die-IP isolation. Die designs, part drawings, alloy recipes and quality records never cross a customer boundary. On-prem deployment is available for sensitive producers.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
AS9100 and NADCAP assurance packagesDisposition and genealogy evidence QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningAS9100, IATF 16949, NADCAP, ASTM documents RUNNING In the design, every answer cites its source
Per-tenant and die-IP isolationRecipes, die designs, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentSensitive producers RUNNING Design option

Read the security overview

Enterprise

Standardise autonomy across the group

One policy model, one audit trail, one benchmark across every cell in every forge, with the alloy, die and qualification models kept private to each site.

Talk to us Enterprise details

  • SSO and role-based access down to the tag level, planned for the 6 to 12 month release
  • Group-wide autonomy policy with per-site override and approval chains
  • Cross-plant benchmarking on yield, scrap, die life, energy and inspection escapes
  • On-prem and plant-edge deployment, with air-gapped operation for defense and sensitive producers
  • Edge autonomy that survives control-plane loss by returning to the controller's last known-good state
  • Dedicated deployment engineer and quarterly model review per forge
FAQ

Straight answers

The questions plant directors, forging engineers and quality engineers ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified process envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Forgiron writes nothing. Press-schedule changes stay supervised by a named forging engineer until the part family is qualified.

Get started

Start with one cell

Start with one heating, press, die or inspection cell and one measurable baseline. A paid pilot on billet heating and press fill, die life or ultrasonic and MPI defect detection shows the number before you commit further.